Advanced Search
    MA Xin-chao. Supervision Control to Work Quality of Laboratory in Nuclear Power Construction Project[J]. PHYSICAL TESTING AND CHEMICAL ANALYSIS PART A:PHYSICAL TESTING, 2010, 46(7): 445-449.
    Citation: MA Xin-chao. Supervision Control to Work Quality of Laboratory in Nuclear Power Construction Project[J]. PHYSICAL TESTING AND CHEMICAL ANALYSIS PART A:PHYSICAL TESTING, 2010, 46(7): 445-449.

    Supervision Control to Work Quality of Laboratory in Nuclear Power Construction Project

    • The problems happened frequently in the trade contract inspection items in the construction contractor laboratory in the nuclear power construction project were showed, the reasons to these problems were analyzed, and the solutions were suggested to strengthen the management of the laboratory, and it can provide good service to the construction project.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return