Advanced Search
    YE Yongkui, ZHOU Hao, HOU Haibin, LI Wang, MEI Bao, SHI Zhigang. Cracking reason of valve leak-off connection pipe of a nuclear power unit[J]. PHYSICAL TESTING AND CHEMICAL ANALYSIS PART A:PHYSICAL TESTING, 2023, 59(2): 43-46. DOI: 10.11973/lhjy-wl202302012
    Citation: YE Yongkui, ZHOU Hao, HOU Haibin, LI Wang, MEI Bao, SHI Zhigang. Cracking reason of valve leak-off connection pipe of a nuclear power unit[J]. PHYSICAL TESTING AND CHEMICAL ANALYSIS PART A:PHYSICAL TESTING, 2023, 59(2): 43-46. DOI: 10.11973/lhjy-wl202302012

    Cracking reason of valve leak-off connection pipe of a nuclear power unit

    • Cracking occurred in the valve leak-off connection pipe of a nuclear power unit. The cracking causes of the leak-off connection pipe were analyzed by means of macroscopic observation, chemical composition analysis, metallographic examination, Vickers hardness test, scanning electron microscope and energy spectrum analysis. The results show that the cracking reason of the leak-off connection pipe was stress corrosion, and the corrosion medium was chloridion. Finally, relevant suggestions were put forward.
    • loading

    Catalog

      Turn off MathJax
      Article Contents

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return