高级检索

    工程建设中理化检验实验室监督检查中的误区

    Errors to Construction Projects of Physico-chemical Testing Laboratory in Supervision Process

    • 摘要: 针对不同监理人员在实际监理过程中对施工承包商实验室监督检查时出现的不同理解及误区进行了系统分析, 提出了基本解决方法, 并指出了如何针对不同实验室(如土建实验室、金属实验室以及一方检测实验室、二方检测实验室和第三方检测实验室)开展实验室的监督及管理工作。此种问题的解决, 有利于工程建设的顺利进行, 同时可规范监理人员的监理活动, 提高监理效率。

       

      Abstract: The errors appeared of different understanding and errors for different supervision personnel in actual supervision process to the construction contractor testing laboratory were analyzed systematically. The basic methods to solve errors were presented, and it was pointed out how to carried out the supervision and management work to different testing laboratory (as civil testing laboratory and metal testing laboratory; party detection testing laboratory and Ⅱ party detection testing laboratory and the third party detection testing laboratory). This species problem was resolved, can conducive smooth for the engineering construction, at the same time can standardize the supervision activities of supervisor, improve the efficiency of supervision.

       

    /

    返回文章
    返回