高级检索

    火电机组基建期锅炉金属部件检验典型问题

    Typical problems of boiler metal parts inspection in thermal power unit construction period

    • 摘要: 火电机组基建期安装前的金属部件入厂检验是通过对受监金属设备的制造质量进行监督,发现设备在制造阶段存在的质量问题,防止缺陷带入设备运行阶段,从而最大程度地消除机组在运行阶段的安全隐患。对火电机组安装前检验发现的锅炉钢结构、受热面管屏、集箱和锅炉管道等部件问题进行分析,结果可为火电机组安装前金属部件入厂检验的检测方法和重点检测部位提供有益参考。

       

      Abstract: The factory inspection of metal parts before the installation of thermal power units during the construction period is to supervise the manufacturing quality of the metal equipment under supervision, find out the quality problems existing in the manufacturing stage of the equipment, and prevent the defects from being brought into the operation stage of the equipment, so as to eliminate the potential safety hazards of the unit in the operation stage to the greatest extent. The problems of boiler steel structure, heating surface tube panel, header and boiler pipe found in the pre-installation inspection of thermal power units are analyzed. The results can provide useful reference for the factory inspection of metal parts before installation of thermal power units in detection methods and key detection parts.

       

    /

    返回文章
    返回