高级检索

    采用横梁位移速率实现GB/T 228.1-2010中的方法A

    Implementation of Method A in GB/T 228. 1-2010 by Using Crosshead Displacement Rate

    • 摘要: 通过大量横梁位移速率控制下的原始拉伸数据,计算了横梁位移控制条件下,名义应变速率与实际应变速率之间的差异,并以此为依据对横梁位移速率进行了修正和验证。结果表明:该修正方法简易可行,建议替代GB/T 228.1-2010中原有的修正方法。

       

      Abstract: Based on a large number of original tensile data under the control of crosshead displacement rate, the difference between nominal strain rate and actual strain rate under the control of crosshead displacement was calculated. On this basis, the crosshead displacement rate was corrected and verified. The results show that the correction method was simple and feasible, and it is suggested to replace the original correction method in GB/T 228. 1-2010.

       

    /

    返回文章
    返回